NAVFAC Geothermal
A design-build project replacing approximately 4,200 linear feet of underground chilled water pipe from the main Chiller Plant multiple Buildings. Underground chilled water piping included but was not limited to chilled water supply and return piping, but also replacing fittings, valves, insulation, and accessories.
***
Market: Energy & Utility
Client: NAVFAC
Location: Washington, DC