Washington Bible Campus Modernization Led acquisition of the historic and vacated Washington Bible College & Capital Area Seminary, located just miles outside of Washington DC. Undertook campus-wide modernization and renovation improvements across heating, cooling, plumbing, moisture control, roofing, fenestration, drainage systems. *** Market: Energy, Utility & HVAC Client: Washington Bible College Location: PG County, Maryland
Gallaudet University Microgrid Oversaw construction of a multi-sourced microgrid to deliver reliable energy across the campus and reduce utility costs. Included a 1.2MW lithium-ion battery system and 4.5MW combined cooling and heating system leveraging the power of geothermal energy. *** Market: Energy, Utility & Special Construction Client: Scale Microgrids / Gallaudet University Location: Washington, DC
Pentagon EV Station Assessed, designed, and implemented the Pentagon’s inaugural EV charging stations on behalf of the Joint Operations Command. Design-build project included 20 EV charging stations as a path toward minimizing the Defense Department’s carbon footprint and improving fleet operation efficiencies. *** Market: Energy & Special Construction Client: WHS Location: Washington, DC
Secure Energy Backup Replaced the backup generator system for a secure site, ensuring the facility had access to a supplemental energy system that was also fully modernized, efficient, and green. *** Market: Energy, Utility & Industrial Construction Client: Classified Location: Classified
JLL Energy Optimization Property management company overseeing 4.6 billion SF of office space required reduction in utility costs coupled with increased efficiencies. Installed 130 metal halide fixtures with LED lighting, resulting in nearly $18k reduction in electricity costs coupled with dramatic increase in longevity of lighting systems. *** Market: Power Optimization – Lighting Client: JLL Location: U.S.
Denver Energy Assessment The General Services Administration required an analysis of its aging mechanical and electrical plant serving the Byron White FOB & USCH in Denver. The chilled water feasibility study included: Make vs buy determination Robotic piping inspection Preliminary options Life-cycle cost analysis *** Market: Assessment Client: General Services Administration Location: Denver, Colorado
Grander Capital Energy Assessment & Modernization Energy assessment for a roughly 360,000 SF building revealed significant energy losses due to legacy single-pane windows. Existing building design made double-pane replacement impossible. Designed and engineered a window film treatment capable of delivering energy efficiencies comparable to double-pane windows at a fraction of the price, resulting in a 10% reduction in [...]
HVAC Upgrades Conducted renovations to the boiler system for the Central Heating located in Washington DC. Operated by GSA, this historic Industrial Central Plant was built in 1933, requiring special construction expertise, and provides a reliable, cost-effective, and environmentally compatible supply of steam and chilled water to government office buildings, national monuments, and museums at the heart of [...]